When do you register a newly let or newly built rental property?
During the rollout you only have to register a property once it is let. The GOV.UK guidance says that from 15 December 2026 to 14 November 2027 you only have to register properties that are let now or that become let in that period. No official page I have read gives a number of days between a tenancy starting and the registration being made. The 28 days people quote is for adding the tenancy and safety information afterwards.
What the official pages say
- Let now. The GOV.UK guidance for landlords says you must register your occupied properties by the end date for their region.
- Let later. The same guidance says that during the rollout you only have to register properties that are currently let, or which become let during this period. The guidance for letting agents describes the properties that need registering as those let when their region’s deadline arrives, or let after that.
- Everyone. The guidance calls 15 November 2027 the date from which all landlords will be required to be registered.
- Empty. You don’t have to register an unoccupied property during the rollout. The guidance says that in the future you will be required to register unoccupied properties before marketing or advertising them.
Three cases side by side
| Your property | When to register | The 28 days |
|---|---|---|
| Let now, and the region’s window hasn’t closed | By the region’s end date. You can register before the region’s start date. | Tenancy and safety information within 28 days of the registration, if you didn’t give it at the time. |
| First let after the region’s end date | The guidance says properties that become let during the rollout have to be registered. It gives no number of days. The Act’s duty has no grace period written into it. | The same: 28 days from the registration for anything outstanding. |
| Empty, and you intend to let it | Not required during the rollout. The draft regulations do allow an entry for a dwelling that is intended to be let, with the property details only. | Under the draft, the tenancy and safety information is due within 28 days beginning with the day a tenancy of that dwelling begins. |
For the middle row I would not plan on any gap at all. Have the registration ready to make when the tenancy starts.
What the Act says about timing
Section 82 of the Renters’ Rights Act 2025 has two rules. A person must not market a dwelling for letting unless there is an active landlord entry for them and an active dwelling entry for the dwelling. And a residential landlord is under a duty to ensure that both entries exist and are active. Neither rule gives a period of grace after a tenancy starts.
Section 82 is not yet fully in force, so the duty in subsection (3) does not yet apply in general. The draft regulations and the guidance set the dates the service will use.
On legislation.gov.uk the section is shown as in force only for specified purposes. Subsection (4) lets the Secretary of State make regulations that disapply the section in set cases or for a set period. The guidance, for its part, treats registering an unoccupied property before marketing it as a rule for the future.
Certificates for a new build or a first let
The register asks for the same three documents as for any other let. A new home just tends to hold different versions of them.
| Document | What the official source says | What the draft regulations ask for |
|---|---|---|
| Electrical | The GOV.UK electrical safety guidance says a new or fully rewired home should have an Electrical Installation Certificate (EIC). With one, the landlord need not carry out further checks or provide a report for 5 years after it was issued, as long as they have complied with their duties under the regulations. The 2020 electrical safety regulations themselves require an inspection and test by a qualified person before the tenancy starts, and don’t mention an EIC. | A copy of the EICR, if one exists, or the appropriate EIC, with the EICR’s expiry date or the EIC’s issue date. |
| Gas | Regulation 36 of the Gas Safety (Installation and Use) Regulations 1998 requires each appliance and flue to be checked within 12 months of being installed, and then at intervals of not more than 12 months. A new tenant must be given the last record before they occupy. | If the dwelling has a gas supply: a copy of the gas safety record, if one exists, and its date of issue. |
| EPC | GOV.UK says an EPC is needed when you are building a new property and when you are renting one out, and that it is valid for 10 years. | Whether a valid EPC had to be given, and a copy of the most recent one, if one exists. |
That leaves an awkward case: a new build with a boiler under 12 months old and no landlord gas safety record yet. The draft asks for the record “if one exists”, and I haven’t found a page that explains what the service does when one doesn’t. Ask a Gas Safe registered engineer what you should hold before the tenant moves in.
A worked example
This example is made up, and the sums are mine, using the formula in the GOV.UK guidance.
A landlord’s first rental property is a new build flat in Coventry. The tenancy starts on 1 July 2027, which is after the West Midlands end date of 14 March 2027, and the landlord registers the same day.
- First payment. The renewal date would be 1 July 2028. The year length is 366 days and 137 days fall before 15 November 2027. So 65 divided by 366, multiplied by 229, gives £40.66 after rounding down. That takes the renewal date as 1 July 2028, as GOV.UK’s own examples do. If it were 30 June 2028, which is how the draft regulations word it, the same formula would give £40.49.
- The 28 days. Counting 1 July as day one, as I read the draft regulations, anything left out is due by 28 July 2027.
- Documents. The EIC and its issue date, the EPC, and the gas position checked with the engineer.
If this were the landlord’s second property the sum would change, because every property shares the renewal date of the first. See is the £65 fee paid every year.
What the sources leave open
- How many days, if any, you have between a tenancy starting and making the registration.
- When the rule on registering before you market a property will start. The guidance says only that it is for the future.
- What the service accepts for gas where no gas safety record exists yet.
- What later changes to the electrical safety regulations do. legislation.gov.uk shows changes from S.I. 2026/1196 not yet applied to regulation 3, and I haven’t read them.
I haven’t filled these in. The regulations are still draft, and I’ll re-read them when they are made.
Sources
Each of these was read on 26 November 2026. If one of them changes, I’ll change this page and note it in the change log.
- Register your rental property: service guidance for landlords (GOV.UK)
- Register your rental property: service guidance for letting agents and property managers (GOV.UK)
- The Private Rented Sector Database Regulations 2026, draft (legislation.gov.uk). Not yet made, so it can change
- Explanatory memorandum to the draft regulations (legislation.gov.uk, PDF)
- Renters’ Rights Act 2025, section 82 (legislation.gov.uk)
- Electrical safety standards in the private and social rented sectors: guidance (GOV.UK)
- Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020, regulation 3 (legislation.gov.uk)
- Gas Safety (Installation and Use) Regulations 1998, regulation 36 (legislation.gov.uk)
- Selling a home: Energy Performance Certificates (GOV.UK)
This page is general information, not legal advice. I’m not a solicitor, gas engineer, electrician or energy assessor. If you’re not sure a certificate is valid, ask the registered engineer or assessor who issued it.